PROJECT REFERENCE • Project: Big C CityLand • Description: Supplying & Installation of Air Condition and Ventilation System • Starting date: 01/06/2015 • Finishing date: within 110 days from 01/06/2015 • Owner: Big C
Category Archives: Completed Project
PROJECT REFERENCE • Project: Big C Bac Giang • Description:Supply & Installation Air Cooled Chiller 1800Kw • Time of Completion: 05/2014 – 12/2014 • Owner: Big C Bac Giang
PROJECT REFERENCE • Project: Metro Supermarket – Buon Me Thuot City • Description: Installation Ducting System • Time of Completion: • Owner: Metro
PROJECT REFERENCE • Project: DA LAT ASUZAC FOOD FACTORY • Description: Install Production Line • Time of Completion: • Owner: DA LAT ASUZAC FOOD FACTORY Picture of Installing 1 Picture of Installing 2
PROJECT REFERENCE • Project: Wanek Furniture Factory No.3 – Building 3 • Description: Supply & Install Vacuum Pump System • Starting date: 08/09/2015 • Finish date: 08/11/2015 • Owner: Wanek Pump Room – Pic 01 Pump Room – Pic 02
PROJECT REFERENCE • Project: JABIL VIETNAM • Description: Supply & Install Fire Protection System follow FM standard • Time of Completion: 20/10/2011 – 12/12/2012 • Owner: JABIL
PROJECT REFERENCE • Project: Intel Vietnam – Canteen • Description: Installation of ACMV System for the Canteen • Owner: Intel Vietnam
PROJECT REFERENCE • Project: First Solar Vietnam • Description: Installation of the BMS System • Owner: First Solar
PROJECT REFERENCE • Project: Estella • Description: Installation of Fuel System for the Generator • Owner: Estella
PROJECT REFERENCE • Project: Hyatt Regency Danang • Description: Installation of Chilled Water Pipe • Owner: Hyatt Regency Danang